Monday, July 21, 2008

Second draft plan produced

A second version of the draft project plan was produced and these were the changes:
- Resource assignment matrix was added.
- Task dependency matrix added.
- Thesis structure was refined and revised.
- Milestones added.
- Project aim added.
This copy was e-mailed to Shiping, David and Naimul.